英国留学生物流管理硕士毕业论文-工程网络和净现值法-物流论文精修建议-Project Networks and the

英国留学生物流管理硕士毕业论文-工程网络和净现值法-物流论文精修建议,Project Networks and the Net Present Value Method


Abstract
In the 1950s United States researchers firstly used network technology, in the 1960s Professor Hua introduced the technology over to China. The network technology has been rapidly applied to project management and other fields. Network optimization technology is a high-level network planning, and also it is an important part of research fields in project management.
Network optimization contains four different sides, which are fixed duration-resources balance, resources limited-shortest duration, duration-coat exchanged and maximizing the net present value of projects, and the last side in present years has become a focus in network optimization.
Based on the fore-researcher’s achievement, some research has been done in this paper on the problem of evaluating and maximizing the net present value of project, activity’s pattern, limited resources, payment scheduling, contract reward and punishment and other factors which all affect the problem are discussed and improves the established mode. Ultimately, the outcomes of the paper are illustrated by a practical instance.

TABLE OF CONTENTS
Page No
TITLE PAGE 1
ABSTRACT 2
TABLE OF CONTENTS 3
Chapter 1 的问题,目标Aims and Objectives不清楚,需要再明确一些
Chapter 1 Introduction 6
1.0 Research Questions 6
1.1 Context of Research 6
1.2 Relevance of Research 6
1.3 Aims and Objectives 7
1.4 Chapter Outline 7
Chapter 2 Literature Review 9
这部分用一个TABLE图表总结一下,怎么缩小这个距离
2.0 Introduction 9
2.1 Background of Project Networks and Network Planning 9
PATE 1 不要写 ONE,要写阿拉伯数字
2.2 An Overview of Time Value of Money 10
2.2.1 Causes of Time Value of Voney
2.2.2 The Importance of time Value of Money
2.3 An Overview Net Present Value Method 13
2.4 Three Subproblem of Maximizing The Net Present Value of Project 13
就是这部分要用一个 TABLE SUMMARISE
2.5 Construction Schedule 15
2.5.1 Make a Construction Schedule 15
2.5.2 The Basic Form of The Construction Schedule 16
2.6 Method of Network Planning 17
2.6.1 The Concept of Network Diagram 17
2.6.2 Network Diagram and The Time Parameter 18
2.6.3 The key Lines, key Activities and Non-critical Activities 18
PATE TWO
留学生物流论文精修这部分是写得最不好的部分,就是NPV和NETWORK PLANNING 写得很不清楚,最主要问题就是没写清楚怎么把两者联系起来,两者怎么关系在一起的,需要更多的说明